1 Product Overview

1.1 Overview

This system can simulate the process of solar power generation, and enable the students to directly recognize the photovoltaic power generation system. And enable students to be familiar with photovoltaic system composition, connection and run principle. To cultivate students to master the corresponding knowledge, technical skills, it is suitable for teaching and training in university, college, technical school, technical institution, higher vocational education, polytechnics.

1.2 Feature

(1) Training workbench adopts aluminum column frame structure, installation type takes measurement meters and load module, training power box is inner integrated installation, there are wheels at the bottom of training workbench, every unit can be flexible move when doing experiment, it is convenient and easy to use, and very durable in use.

(2) Solar energy panel use aluminum frame to fix, it can adjust solar panel angle according to solar ray angle. There are wheels at the bottom of training workbench, every unit can be flexible move when doing experiment, it is convenient and easy to use, and very durable in use.

(3) Equip with full experiment circuit and components, it can combine and do different training content.  

(4) Training workbench is with good safety protection system.  

Specification

– Condition: Brand New and Unused

– Mobile Work station Dimension 72 inch (183cm) L x 72inch (163cm) H x 34 inch(86cm) W Comprising panel set A for wiring and panel set B for PV array connection and lighting

 

Panel Set A

1.1 Swivel casters (4) with 2 locking brake Balance of System Components are pre-mounted in Trunking and ducting to facilitate wiring and routing of cablesComponents pre-mounted on board for off Grid PV system circuit includes

– DC array Isolator with AMC4 connector terminated to receive external solar cable connection to PV Solar Array

– 2 sets of MCBs for DC Array and Controller protection

– Charge Controller with provision for battery charging, DC external loads and connection to inverter; Have display value on Voltage, current.

– Battery Disconnect Switch

– Battery 100 AH ,12V deep cycle Lead Acid battery

– AC Inverter, input 12V to 24V, output 230V, 50 Hz, type pure sine wave type

– AC Isolator

– AC consumer unit complete with DP

 MCB isolator, RCB, SPD,10A MCB,

 20A MCB,20A MCB

– Provision for earthing terminations for both DC and AC connection

1.2 All components’ rating selected must comply to approved IEC standard and meeting local regulation on over current and earth protection requirements. Cable provided must be of appropriate color codes and sizes meeting to approved IEC PV regulation requirement.

 

Set B

  1. PV Array with Flood Lighting lamp assembly mounted on firm and steady mobile stand with swivel wheels Swivel casters (4) with 2 locking

2.1 Lamp assembly requirements

– 4 lamps set mounted on anodised, non-corrosive swivel supports on each side of board

– 4 lamps to be electrically connected to patch panels for easy control on separate lighting set

– Output of lamps. wide focus beam (300W each) to be able to provide minimum irradiance of 500 W/m2 up to maximum 1000 W/m2

2.2 PV Module and array requirement

2.2.1. Four PV Polycrystalline modules pre-mounted and connected with following requirement on each PV module (min)

 Power = 375 W

 Voltage = 18V

 Isc = 18A

 Voc = 21.2V

2.2.2 Each module to be connected with bypassed diode (accessible) for inspection and with positive and negative terminal terminated in MC 4 connectors and properly labelled terminal wires.

2,2,3 Parallel AMC4 connectors with solar wire assemble and MC 4 straight connector assembly to be of sufficient length and number to be able to connect the 4 modules in series or parallel training.

2.2.4 The modules are to be mounted on inclinable plane which is lockable at 0, 15, 30, 45, 60, 75, 90 degrees to horizontal position respectively

– CE compliant (or equivalent)

– Hard copy or soft copy operation manual in English or Khmer

– Warranty: At least 3 years on parts and service

3.Supplied with English user manual

Supplied with English demo video

Supply free online training for 1 day