Description
Implement synchronous control of systems in the test rack including: Central control system, excitation signal generator system, measurement system, input and output distribution system, power supply system , system software program
Executing test mode selection control: functional testing of modules to be tested, self-testing
Implement test object selection control: module test, test rack test
Carrying out the control of the equipment to test the distance signal generation system in the working modes of the transmitter
Key Design Features
Implement synchronously the central control system with excitation signal generator systems, measurement systems, input and output distribution systems, power supply systems, and software program systems.
The central computer can control the signal generators, measuring devices, the blocks of the input and output distribution system, the source blocks through the software program and the operations on the central system.
On the software interface of the central control system, the test modes can be selected: checking the function of the modules to be tested, self-checking the test stand.
Applications
Perform device control operation test system pseudo-control command
Perform device control to check the generator’s source voltages and detection currents
Perform active device control to check the generator’s operation when working in different distance modes of the search circuit and the transmitter’s working switching circuit.
Carrying out the device control to check the phased pulse parameter
Perform device control operation and check the working of frequency stabilizer automatic circuit
Features
Implement synchronously the central control system with excitation signal generator systems, measurement systems, input and output distribution systems, power supply systems, and software program systems.
The central computer can control the signal generators, measuring devices, the blocks of the input and output distribution system, the source blocks through the software program and the operations on the central system.
On the software interface of the central control system, the test modes can be selected: checking the function of the modules to be tested, self-checking the test stand.
The process of performing the test of the modules to be tested and the self-testing of the test stand must correctly execute the selected mode.
On the software interface of the central control system, the test objects can be selected: test modules, test racks.
The process of performing the module test and the test stand test must be performed correctly for the selected object.
The program to control the equipment, to test the remote signal generator system in the working modes of the transmitter, must be scientific, logical, simple, and consistent with the technical flow chart. maths
The program to control the equipment, to test the system, to generate control commands, must be scientific, logical, simple, and consistent with the algorithm flowchart.
The program to control the operation equipment to check the source voltage and detector current of the generator must ensure the scientific, logical, simple, and consistent with the algorithm flowchart.
The program to control the operation equipment to check the generator’s operation when working in different distance modes, the search circuit and the working switch of the transmitter must ensure the scientific, Logical, simple, and suitable for algorithmic flowchart.
The program to control the device to test the phased pulse parameter must be scientific, logical, simple, and consistent with the algorithm flowchart.
The program to control the operation of the automatic frequency stabilizer circuit must ensure the scientific, logical, simple, and consistent with the algorithm flowchart.
The program must be easy to manipulate and use with users.