TB-211009-S-02 Supply of PLC & Control system work Station (Basic) Educational Equipment Electrical Engineering Training Equipment
- All components must secure properly on the work station as per drawing and instruction.
II. All electrical measuring equipment must properly installed so that all measurable parameter can be taken easily.
III. All components must connect with safety laboratory cable option to connect easily without having any human body interaction to avoid electric shock.Table size (Min): AL45 Inch X Width 25 Inch X Height 65 Inch.
Control system software: Any reputed control system software (independent) that can communicate with Siemens Logo 8.1 & TIA Portal using a hardware interface with all its input and output interface (Both Digital and analog).Options:
(1) Must support all conventional relay control system.
(2) Must support all close loop control system.
(3) Real time simulation.
(4) Real time multiple curve simulation
(5) Ladder symbol
(6) Proximity switch
(7) General switch
(8) Pneumatic components
(9) Compressor
(10) Electro-pneumatic valve.
(11) Differential pressure control valve
The work station must include the following component
(1) 6 × Relay with 2 NO and 2 NC contact.
(2) 4 × Magnetic contact with auxiliary.
(3) 10 × Push button switch.
(4) 2 × Double acting cylinder.
(5) 2 × 5/2 Solenoid valve single coil.
(6) 2 × Time delay relay.
(7) 1 × Counter 1 fold.
(8) 4 × Digital Panel meter.
(9) 8 × Indicator Lamp.
(10) 1 × Buzzer.
(11) 1 × Siemens Logo 8.2 CPU build in 6 digital input x 4 relay output x 2 analog input.
(12) 1 × 4 transistor input output module.
(13) 1 × 2 channel APT100 module.
(14) 1x 2 channel 4-20 ma module
(15) 1 x 2 channel analog output module
(16) 1 × Siemens 4″ color monitor.
(17) 50 × safety cable.
(18) 1 × built in 24 power supply.
(19) 2 × Multi turn potentiometer.
(20) 1 × 0.5 VFD (Siemens) .5 kw
(21) 1 × 3 phase induction motor.
(22) 4 × Panel volt meter.
(23) 1 x 24 volt supply.
(24) 1 × Desktop Computer (Brand PC), Processor: Minimum Core i5 (8th Gen), RAM: 8 GB, Operating System: Windows 10, PLC Software.
(25) 1 × Multi-plug.
(26) Assembly of the work station
(27) Wiring of the work- station
(28) Testing & commission of the work-station
Additional condition:
(a) All equipment mentioned above must in operation as required as a PLC work-station. To make the system fully operation if additional component is required supplier must provide that equipment to make the work station fully operational.
(b) All required cable, connector, soldering, cable tray must supply as required by the station
(c) All electrical connection must be covered properly to body contact.
(d) The work-station must easily transferable from one place another with wheel.
(e) All individual components must have identification number and name properly to understand by the trainees.
(f) The work-station must silver aluminum frame body.
(g) All assembly component need to sully along with the work- station
(h) All assembly, wiring, installation, testing, commissioning must include in the quoted price.
(i) Must manufactured in Bangladesh as per specifications & instructions.